Extensions and new builds in the Vega Baja.
An extra room, an enclosed porch or a house from an empty plot. The plans, the permit and the build, by the same team.
Novux replies Monday to Friday, 8 am to 3 pm.
What an extension includes.
From the plans to the final tile. The written quote lists every item.
Plans and permit
The drawings for the extension and the application to your town hall before work starts.
Foundations and floor
The base of the extension, with a ventilated floor so the new floor sits off the ground and stays dry.
Structure and walls
Walls, columns, roof and the openings for doors and windows.
Porches and enclosed terraces
Enclosing a porch or a terrace to gain an extra room.
Plumbing and wiring
Power, water and drainage connected to the rest of the house.
Finishes
Flooring, tiling and paint so the extension matches the rest of the house.
An extension, step by step.
How an extension in Formentera del Segura came together, from the floor structure to the tiles.

Floor structure
Block walls, joists and ceramic infill. The new floor sits off the ground, so it stays dry.

Concrete pour
The top slab, poured under a shade cloth so the concrete doesn't dry out in the sun.

Tiling
Large-format tiles with levelling clips at every joint, so no tile sits higher than the next.
Three steps to your build.
Visit and quote.
Novux visits the house with no obligation, measures up and gives you a written quote, item by item.
Plans and permit.
The job is drawn up and the permit is filed with your town hall.
Build and handover.
One person in charge on site until the end. At handover, every detail is checked with you.
Does an extension need a permit?
Yes. An extension adds floor space to the home and needs a permit from the town hall. Novux prepares the plans and handles the application.
Does Novux build houses from an empty plot?
Yes. The plans, the permit and the build are handled by the same team, from the foundations to the handover.
How much does an extension cost?
It depends on the size, the structure and the finishes. After the visit you get a written quote, item by item.
How long does an extension take?
It depends on the size and on how long the permit takes. The build timeline goes in the written quote, next to the price.
Your project starts with a message.
Novux replies Monday to Friday, 8 am to 3 pm.