Skip to content

Builders in Dolores.

Dolores was founded in the 18th century on drained farmland and sits just 4 m above sea level. On any project here, Novux looks at water and ground damp from the first visit.

Novux replies Monday to Friday, 8:00 to 15:00.

Building work in Dolores.

  1. Dolores town hall

    Its online office lists a declaración responsable for planning matters and an application for a planning licence.

  2. Irrigation channels

    The farmland around the town is drained by a network of channels, and the Mayayo channel runs right through the town centre.

  3. Flood risk

    Dolores was flooded in the September 2019 storm. Before planning an extension, it is worth checking the plot on the PATRICOVA flood maps.

  4. A floor clear of the ground

    On extensions, Novux builds the new floor as a ventilated suspended slab, so it sits clear of the soil and does not pick up damp.

What Novux builds in Dolores.

Design and build with one team, from the drawings to the last tile.

  • Full renovations

    Houses, flats, kitchens and bathrooms.

  • Extensions and new builds

    An extra room, an enclosed porch or a house from an empty plot.

  • Printed concrete and outdoor work

    Driveways, slabs, walls and terraces.

  • Finishes

    Flooring, tiling, plasterboard and painting.

Real jobs.

Novux has no published project in Dolores yet. The two projects on this site are in Formentera del Segura, about 8 km by road. One is an extension on a suspended slab, shown stage by stage.

  • Finished driveway in red printed concrete with a rosette mould

    Printed concrete

    Driveway · Formentera del Segura

  • Ventilated floor slab of an extension, with joists and ceramic blocks on block walls

    Ventilated floor slab

    Extension · Formentera del Segura

  • Freshly poured concrete slab under a black shade, next to the house wall

    Concrete topping

    Extension · Formentera del Segura

  • Large grey floor tiles laid with levelling clips in the joints

    Large-format tiling

    Extension · Formentera del Segura

Three steps to your build.

  1. Visit and quote.

    Novux visits the house with no obligation, measures up and gives you a written quote, item by item.

  2. Plans and permit.

    The job is drawn up and the permit is filed with your town hall.

  3. Build and handover.

    One person in charge on site until the end. At handover, every detail is checked with you.

Questions from Dolores.

If your question isn't here, contact Novux on WhatsApp.

Ask on WhatsApp

How do I know if my house is in a flood zone?

The Generalitat's flood risk plan, PATRICOVA, maps it. Dolores town hall also issues planning certificates through its online office.

Can an extension keep damp out?

Novux builds the new floor on a ventilated suspended slab, so it is separated from the ground and does not draw up moisture.

Do you work in English?

Yes. Novux works in Spanish and English and gives you the quote in writing.