Skip to content

Builders in Guardamar del Segura.

After the 1829 earthquake, Guardamar was rebuilt on a grid of low houses with large courtyards. Today it has 11 km of coastline and a pine forest of about 800 hectares on the dunes, and both shape what can be built.

Novux replies Monday to Friday, 8:00 to 15:00.

Building work in Guardamar.

  1. Structural or not

    Guardamar's online office has one declaración responsable for general works and a separate one for works that affect the structure.

  2. A town of low houses

    The new town was laid out after the 1829 earthquake on a grid, with low houses and large courtyards built to withstand future quakes.

  3. The Coastal Law

    Near the beach the coastal protection zone applies, 100 m inland from the shore or 20 m on land that was already urban in 1988. No new homes can go inside it.

  4. Sea air

    Within 5 km of the coast, Spain's structural code treats outdoor concrete as exposed to salt spray.

What Novux builds in Guardamar.

Design and build with one team, from the drawings to the last tile.

  • Full renovations

    Houses, flats, kitchens and bathrooms.

  • Extensions and new builds

    An extra room, an enclosed porch or a house from an empty plot.

  • Printed concrete and outdoor work

    Driveways, slabs, walls and terraces.

  • Finishes

    Flooring, tiling, plasterboard and painting.

Real jobs.

Novux has no published project in Guardamar yet. The two projects on this site are in Formentera del Segura, about 10 km by road: a printed concrete driveway and an extension shown stage by stage.

  • Finished driveway in red printed concrete with a rosette mould

    Printed concrete

    Driveway · Formentera del Segura

  • Ventilated floor slab of an extension, with joists and ceramic blocks on block walls

    Ventilated floor slab

    Extension · Formentera del Segura

  • Freshly poured concrete slab under a black shade, next to the house wall

    Concrete topping

    Extension · Formentera del Segura

  • Large grey floor tiles laid with levelling clips in the joints

    Large-format tiling

    Extension · Formentera del Segura

Three steps to your build.

  1. Visit and quote.

    Novux visits the house with no obligation, measures up and gives you a written quote, item by item.

  2. Plans and permit.

    The job is drawn up and the permit is filed with your town hall.

  3. Build and handover.

    One person in charge on site until the end. At handover, every detail is checked with you.

Questions from Guardamar.

If your question isn't here, contact Novux on WhatsApp.

Ask on WhatsApp

Can I extend a house near the beach?

It depends how close it is to the sea. Inside the Coastal Law protection zone no new homes can be built. Novux checks where your plot sits before drawing the extension.

What permit do I need to remove a load-bearing wall?

In Guardamar it goes through the declaración responsable for works that affect the structure. Novux prepares the documents and files them for you.

Will the builders block my street?

If a lorry or skip won't fit on the plot, Guardamar has permits for closing a street or reserving parking during works. They are applied for before the work starts.