Builders in Guardamar del Segura.
After the 1829 earthquake, Guardamar was rebuilt on a grid of low houses with large courtyards. Today it has 11 km of coastline and a pine forest of about 800 hectares on the dunes, and both shape what can be built.
Novux replies Monday to Friday, 8:00 to 15:00.
Building work in Guardamar.
Structural or not
Guardamar's online office has one declaración responsable for general works and a separate one for works that affect the structure.
A town of low houses
The new town was laid out after the 1829 earthquake on a grid, with low houses and large courtyards built to withstand future quakes.
The Coastal Law
Near the beach the coastal protection zone applies, 100 m inland from the shore or 20 m on land that was already urban in 1988. No new homes can go inside it.
Sea air
Within 5 km of the coast, Spain's structural code treats outdoor concrete as exposed to salt spray.
What Novux builds in Guardamar.
Design and build with one team, from the drawings to the last tile.
Real jobs.
Novux has no published project in Guardamar yet. The two projects on this site are in Formentera del Segura, about 10 km by road: a printed concrete driveway and an extension shown stage by stage.

Printed concrete
Driveway · Formentera del Segura

Ventilated floor slab
Extension · Formentera del Segura

Concrete topping
Extension · Formentera del Segura

Large-format tiling
Extension · Formentera del Segura
Three steps to your build.
Visit and quote.
Novux visits the house with no obligation, measures up and gives you a written quote, item by item.
Plans and permit.
The job is drawn up and the permit is filed with your town hall.
Build and handover.
One person in charge on site until the end. At handover, every detail is checked with you.
Can I extend a house near the beach?
It depends how close it is to the sea. Inside the Coastal Law protection zone no new homes can be built. Novux checks where your plot sits before drawing the extension.
What permit do I need to remove a load-bearing wall?
In Guardamar it goes through the declaración responsable for works that affect the structure. Novux prepares the documents and files them for you.
Will the builders block my street?
If a lorry or skip won't fit on the plot, Guardamar has permits for closing a street or reserving parking during works. They are applied for before the work starts.
Also nearby.
Novux works in these towns with the same team.
- TorreviejaRenovations and extensions in Torrevieja, from apartments in a community of owners to houses near the sea. Plans, permit and build by one team, in English.
- Ciudad QuesadaBuilders in Ciudad Quesada, Rojales. Novux handles your building permit at Rojales town hall, speaks English and sends progress photos by WhatsApp.
- DoloresBuilders in Dolores, a farming town on the Segura plain just 4 m above sea level. Renovations and extensions planned with flood risk and damp in mind.
Your project starts with a message.
Novux replies Monday to Friday, 8 am to 3 pm.